Efficient & Reliable
Setting up a Sewage Treatment Plant (STP) is mandatory for almost all new residential complexes, commercial buildings, IT parks, hospitals, and hotels in Chennai. Before construction, consent from the Tamil Nadu Pollution Control Board (TNPCB) is required. In Chennai, untreated sewage frequently contaminates local water bodies, such as the Cooum River and Marina Beach, posing serious health risks and contributing to waterborne diseases. Seasonal flooding during monsoons exacerbates pollution, overwhelming drainage systems and creating significant sanitation issues. Additionally, rapid urbanization has outpaced infrastructure development, leading to environmental degradation and threats to local ecosystems. Approximately 5 million children die annually due to waterborne diseases caused by sewage. Effective sewage treatment solutions are urgently needed.
Our Sewage Treatment Plant for Chennai, easySTP, is designed specifically for the city’s needs. By utilizing state-of-the-art technology, and ensure efficient removal of contaminants.
Our easySTP offers environmentally friendly sewage treatment methods tailored to Chennai’s specific challenges, reducing pollution and protecting vital water resources like the Cooum River and Marina Beach. These sustainable solutions minimize environmental impact while maximizing treatment effectiveness. By addressing the issues of untreated sewage and improving sanitation, easySTP fosters a healthier ecosystem and enhances public health in Chennai, especially during the monsoon season.
Chennai’s intricate urban sewage challenges require systematic treatment strategies tailored to its specific context. Our expert team develops customized solutions to address these pressing needs, ensuring optimal performance across diverse settings. By focusing on local conditions, we aim to improve sewage management and enhance the overall health of Chennai’s ecosystems, particularly in areas affected by untreated sewage and seasonal flooding.
TamilNadu Pollution Control Board for Residential ,Industries , Commercial and Educational Institutions.
Setting up an easySTP wastewater treatment plant , you need to obtain the Consent to Establish (CTE). Once the plant is ready to operate, ensure you secure the Consent to Operate (CTO) to begin running your easySTP.
TNPCB requires the reuse of treated water for non-drinking purposes to save water and cut down on water pollution. easySTP systems are made to in view of this.
Ensuring a reliable STP is key to meet TNPCB rules. With easySTP, you get a wastewater treatment plant that’s simple and affordable to maintain. These steps help meet TNPCB norms and reduce water pollution, keeping the environment safe.
TamilNadu Pollution Control Board : TNPCB | |||
---|---|---|---|
Mega & Metropolitan cities | |||
SL.No | Description | Old Norms | New Norms |
1 | pH | NA | 5.5 to 9.0 |
2 | BOD | < 30 | < 10 |
3 | COD | <250 | 50 |
4 | Total Suspended Solids(TSS) mg/lit | <100 | <20 |
5 | Total Nitrogen | <100 | <10 |
6 | Construction projects having a built-up area of less than 20,000 sq. mt. must obtain its | NA | < 20,000 sq. mt. |
Consent to establish and operate a sewage treatment plant (STP). |
QUESTIONS & ANSWERS
No STP is truly “zero maintenance,” but some advanced systems minimize maintenance needs while still requiring regular monitoring to comply with TNPCB norms.
Technologies like Moving Bed Biofilm Reactor (MBBR) and Membrane Bioreactor (MBR) effectively meet TNPCB standards and can be customized for specific sites.
TNPCB norms are generally strict, specific exemptions may apply to small-scale or temporary projects; direct consultation with TNPCB is advisable.
Rules are applicable for projects that begun after March 2021. Whatever is specified in the CTE has to be implemented
SUBSCRIBE to our monthly NEWSLETTER
Sewage Treatment Plant Suppliers in Hyderabad